Pipe PerfectPro

Pipe installation

Professional Pipe Installation for Supply and Drainage Systems

New pipework is the one chance to get a building’s water system right for decades. We plan the layout, size every line, choose the correct material for each run and pressure-test the system before a single tile goes back on.

Two copper supply pipes installed along a wall

What we install

Installation services for every part of the system

Whether you are fitting out a single bathroom or piping an entire building, the work is planned around how the space will be used — not just where pipes happen to fit.

Kitchen & bathroom lines

Hot and cold supply to sinks, basins, showers and cisterns, with isolation valves at every fixture.

Tank, pump & riser connections

Rooftop and underground tank connections, pump lines, risers and float valves sized for your demand.

Hot-water pipework

Heat-rated CPVC, PPR or copper lines from water heaters, with proper valves and expansion allowance.

Soil, waste & vent stacks

uPVC drainage with correct falls, access points for cleaning and venting that keeps traps sealed.

Complete re-piping

Phased replacement of old or corroded systems, planned to keep the building usable during the work.

Renovation rough-in

First-fix pipework for kitchen and bathroom remodels, tested and documented before walls close.

Materials

Two systems, two very different jobs

Supply lines carry water under pressure. Drainage lines carry waste by gravity. They need different pipe, different joints and different testing — so we treat them as two separate systems from day one.

Stack of green PPR water supply pipes

Pressure supply

PPR for hot & cold water

Polypropylene random copolymer pipe is joined by heat fusion, so pipe and fitting become one piece with no threads or glue to fail. It handles hot water well and resists scale.

Stacked PVC drainage pipes ready for installation

Gravity drainage

uPVC for soil & waste

Unplasticised PVC is smooth inside, light to handle and solvent-welded. With the right fall and access points, it carries waste quietly and is easy to maintain.

Plumber installing a pipe connection with a wrench

Installation process

Six stages from survey to handover

01

Site survey

We measure, check existing lines and pressure, and agree fixture positions with you.

02

Layout & sizing

A pipe route and sizing plan is drawn up, with the material for each run.

03

Quote & schedule

You receive an itemised quote and a timeline that fits around your project.

04

First fix

Pipes, supports and fittings are installed and labelled before walls are closed.

05

Pressure test

Supply lines are held under test pressure; drains are flow-tested. Any issue is fixed now.

06

Final fix & handover

Fixtures are connected, valves checked, and you receive a written summary of the system.

Standards we install to

Details that decide how long an installation lasts

Most early failures in new pipework come from a short list of shortcuts. We design them out from the start.

Installation FAQ

Planning questions, answered

Still deciding? These are the questions clients ask most before a new installation.

A single bathroom is usually a few days including testing. A full apartment or small building is planned in stages; your quote includes a schedule based on the actual scope.

Yes. We coordinate first-fix and final-fix visits with your contractor so pipework is tested before walls and floors are finished.

Usually PPR for hot and cold supply, uPVC for drainage and HDPE for buried service lines. We explain any exception, such as copper for exposed runs, in the quote.

We can supply all pipe, fittings and valves from reliable sources, or install materials you provide if they meet the requirements for the job.

That is exactly why we test before closing up. Any weak joint is remade and retested at our cost before handover.